MARGARET’s off to a meeting t the park HQ and I have a bunch of video to edit into vertical clips for my socials/reels. There’s also a bunch of routine admin stuff needing done.
I’ve also realised that I need to keep on top of music submissions for my radio show otherwise the pile gets too much to handle.
In the office I start heatforming the paperweight stands for Manson Glass. A hundred of them. Fifty big and fifty small. I finished cutting the acrylic the other day and want to ave them ready for Will to collect when drops the kids off tomorrow (Friday).
The jig I designed and then 3D printed works a treat. It’s still time consuming, but every one turns out perfect and I don’t burn myself in the process.
I have them all done by the time my late afternoon guitar student arrives.
Once he’s through, I take the audiopoint info panel to the audiopoint to check sizes and mounting options. A build up of varnish is preventing it fitting the way I want, but some sanding should sort that easily enough. That might need some subsequent varnishing/protection tho’ which might take time.